SDLC/SDLC Mcq Question Set 1 Sample Test,Sample questions

Question:
 In the V-V model of software development, testing starts in parallel with the development. True or false

1.True

2.False

3.all of the above

4. none of the mentioned


Question:
 System Development Life Cycle (SDLC) is___ used by the system experts to design a system.

1.A processor

2.A process

3.A system

4.None of these


Question:
 Technical writers generally provide the ________ for the new system.

1. programs

2.network

3.analysis

4.documentation


Question:
 The ___ phase of SDLC concerns with the integration of system elements.

1.Implementation

2.Analysis

3.Requirement

4.None of these


Question:
 Which of the following is a characteristic of Agile development?

1.Shared code ownership

2. Implement the simplest solution to meet today's problem

3.Continual feedback from customer

4.All of the above


Question:
A System life cycle model describes ___ criteria for each phase.

1.Up and down

2.Pull and push

3.Entry and exit

4.None of these


Question:
Actual programming of software code is done during the ____________ step in the SDLC.

1.Maintenance and Evaluation

2.Design

3.Analysis

4.Development and Documentation


Question:
Debugging is:

1.creating program code.

2.finding and correcting errors in the program code.

3.identifying the task to be computerized.

4.creating the algorithm.


Question:
Economic feasibility is a study to complete the project within the budget.

1.True

2.False

3.all of the above

4. none of the mentioned


Question:
Enhancements, upgrades, and bug fixes are done during the ____________ step in the SDLC.

1. Maintenance and Evaluation

2.Problem/Opportunity Identification

3.Design

4.Development and Documentation


Question:
he problem statement includes the ____________, which lists specific input numbers a program would typically expect the user to enter and precise output values that a perfect program would return for those input values.

1.testing plan

2.error handler

3.IPO cycle

4.input-output specification


Question:
How many steps are in the program development life cycle (PDLC)?

1. 4

2.5

3.6

4. 10


Question:
How many steps are in the systems development life cycle (SDLC)?

1. 4

2. 5

3.6

4.10


Question:
Identify missing SDLC phase,
Problem identification → Requirement analysis → ___ → Implementation → Testing → Deployment Maintenance

1.System print

2.System design

3.System hardware

4.None of the mentioned above


Question:
In a college,students are asked to develop a software. Which model would be preferable?

1.Waterfall model

2.Spiral model

3. Agile model

4.Code and fix model


Question:
In incremental model, requirements do not need to be prioritize. True or false

1.True

2. False

3.all of the above

4. none of the mentioned


Question:
In SDLC, after getting the problem identification, Requirement analysis begins.

1.True

2.False

3.all of the above

4. none of the mentioned


Question:
In SDLC, Problem identification,

1.This is the first and initial phase of SDLC.

2.identify the real problem for which they want a solution

3.It takes time to problem identification

4.All of the mentioned above


Question:
In the Analysis phase, the development of the ____________ occurs, which is a clear statement of the goals and objectives of the project.

1.documentation

2. flowchart

3.program specification

4. design


Question:
Most modern software applications enable you to customize and automate various features using small custom-built “miniprograms” called:

1.macros.

2.code.

3.routines.

4.subroutines.


Question:
Physical design shows a relationship between different components of the system according to it's ___.

1.Logical design

2.Physical design

3.Abstract view

4.None of the mentioned above


Question:
SDLC is ___ process for building System.

1.Efficient

2.Non systematic

3.A systematic

4.None of these


Question:
SDLC models are also referred as ___

1.Spiral Model

2.Big Bang Model

3.System Development Process Models

4.None of these


Question:
SDLC works by ___ of System development.

1.Lowering the cost

2.Higher in the cost

3.Average in the cost

4.None of these


Question:
Selection of particular life cycle model is based on,

1.Requirements

2.Technical knowledge of development team

3.Users

4.All of the above


Question:
Strict configuration management is required during Rapid Action Development. True or false.

1.True

2. False

3.all of the above

4. none of the mentioned


Question:
System Development Life Cycle (SDLC) aims to produce a ___ system.

1.Low quality

2.Average Quality

3.High-quality

4.None of these


Question:
Testing objective is different for each phase of life cycle activity. True or false.

1.True

2.False

3.all of the above

4. none of the mentioned


Question:
The make-or-buy decision is associated with the ____________ step in the SDLC.

1.Problem/Opportunity Identification

2.Design

3.Analysis

4. Development and Documentation


Question:
The organized process or set of steps that needs to be followed to develop an information system is known as the:

1.analytical cycle.

2. design cycle.

3.program specification.

4. system development life cycle.


Question:
The problem statement should include all of the following EXCEPT:

1. input.

2.output.

3.processing.

4.storage.


Question:
The requirement analysis is a detailed analysis which includes the answer of,

1.What is the problem? What is the solution? Is solution feasible?

2.How much time required solving the problem? How it will be resolved?

3.How many resources will be required?

4.All of the mentioned above


Question:
The SDLC involves ___ as explained.

1.Two phases

2.Seven phases

3.Six phases

4.None of these


Question:
The Waterfall Model was the ___ Process Model.

1.First

2.Second

3.Third

4.None of these


Question:
The _______ determines whether the project should go forward.

1.feasibility assessment

2. opportunity identification

3. system evaluation

4.program specification


Question:
Translating the algorithm into a programming language occurs at the ____ step of the PDLC.

1.Debugging

2.Coding

3.Testing and Documentation

4.Algorithm Development


Question:
Translating the problem statement into a series of sequential steps describing what the program must do is known as:

1. coding.

2.debugging.

3.creating the algorithm.

4.writing documentation.


Question:
What is full form of SDLC?

1.System Design Life cycle

2.Software Design Life Cycle

3.System Development Life Cycle

4.Software Development Life Cycle


Question:
Which of the following are advantages of iterative model?

1. Early revenue generation

2.Simpler to manage

3.Divided workload

4.All the above


Question:
Which of the following are incremental developmental models?
1. Prototyping
2. V model
3. Rapid Action Development (RAD)
4. Agile development
5. Rational Unified Process (RUP)
6. Waterfall model

1.1,2,4

2.1,3,4,5

3.1,2,3,4,5

4. All of the above


Question:
Which of the following are not type of SDLC models?

1.Big bang model

2.Code and fix model

3.Agile model

4. Capability Maturity model


Question:
Which of the following is not a phase of SDLC?

1.Requirement gathering

2.Maintenance

3.Analysis

4.All of the above


Question:
With reference to System design, which of the following is correct,

1.System design is a blueprint of proposed solution

2.It creates logical design

3.If any changes required, analysts redesign it.

4.All of the mentioned above


Question:
With reference to System development, SDLC is an acronym of System Development Life Cycle.

1.True

2.False

3.all of the above

4. none of the mentioned


Question:
__ is a SDLC phase which deploys the software to the production environment so users can start using the product.

1.Deployment

2.Implementation

3.Testing

4.None of the mentioned above


Question:
___ is / are the most important and fundamental phases of SDLC.

1.Preliminary investigation

2.Requirement Analysis

3.Design, Testing and Implementation

4.All of the mentioned above


Question:
___ of the system gives long life to the new system.

1.Implementation

2.Maintenance

3.Testing

4.None of the mentioned above


Question:
_____ is the process of translating a task into a series of commands that a computer will use to perform that task.

1.Project design

2.Installation

3.Systems analysis

4.Programming


Question:
______ design and implement database structures.

1.Programmers

2.Project managers

3.Technical writers

4.Database administrators


Question:
______ manage the system development, assign staff, manage the budget and reporting, and ensure that deadlines are met.

1.Project managers

2.Network engineers

3.Graphic designers

4.Systems analysts


Question:
_________ spend most of their time in the beginning stages of the SDLC, talking with end-users, gathering information, documenting systems, and proposing solutions.

1. Systems analysts

2.Project managers

3.Network engineers

4.Database administrators


More MCQS